Biz Sizi Arayalım
Telif Talep Formu

Periodic Inspection of Lifting and Handling Appliances




Hoisting and Conveying Equipment load in the workplace , lifting and transportation of personnel and materials are used constantly and structurally constant danger hosts machinery and equipment for the operating conditions.

 

This equipment operating in close proximity to employees and keep them so that they are granted permanent control and that could be dangerous to be kept under surveillance business tool. In our country, as a result of incorrect use of lifting and transmission device consists of a number of unfortunate accidents cases.

 

periodic control and Forwarding necessity of lifting equipment ; In the Use of Work Equipment Regulations Health and Safety Requirements under Annex III, section 2 of Article 2.2 Periodic Subject to Control Business Equipment . subparagraph ( lifting and carrying equipment ) and are specified in sub-paragraph .

periodic control and Forwarding necessity of lifting equipment ; In the Use of Work Equipment Regulations Health and Safety Requirements under Annex III, section 2 of Article 2.2 Periodic Subject to Control Business Equipment . subparagraph ( lifting and carrying equipment ) and are specified in sub-paragraph .

Delivery of lifting and control equipment ; Unless otherwise specified in the standard , lifting equipment is made by at least 1.25 times the load of the declared load. This in conjunction with load testing regulations for me to effectively and safely remove these equipment and is strong enough to keep them suspended and this has necessitated the presence of adequate load bearing and load brake.

 

Hoisting and Conveying Machinery periodic inspections of the periodic inspection intervals and criteria determined by standard business equipment is carried out in the interval and if the criteria stipulated by the manufacturer. In this respect , periodic control determined the work equipment by manufacturer, found that workplace conditions, taking into consideration factors such as usage time and frequency of use, according to risk assessment results will be carried out by occupational safety professional, it is carried out at intervals to be determined . The designated periodic inspection interval should not exceed one year, except for the exceptions specified in this Regulation.

Hoisting and Conveying Machinery periodic inspections of the periodic inspection intervals and criteria determined by standard business equipment is carried out in the interval and if the criteria stipulated by the manufacturer. In this respect , periodic control determined the work equipment by manufacturer, found that workplace conditions, taking into consideration factors such as usage time and frequency of use, according to risk assessment results will be carried out by occupational safety professional, it is carried out at intervals to be determined . The designated periodic inspection interval should not exceed one year, except for the exceptions specified in this Regulation.

UZMAN MUAYENE VE GOZETIM , carries out periodic inspection and testing in accredited inspection body independent objective and reliable 3rd party engineering controls offering high standards of service to you the precision and used in your business by means of calibrated measurement tools Hoisting and Conveying Equipment with on-site machine Engineer qualified controllers.

 

UZMAN MUAYENE VE GOZETIM HELD BY NATURAL PERIODIC CONTROL LIFTING AND TRANSMISSION EQUIPMENT

 

  • Crane Types ( Cranes , Monorail cranes , gantry cranes , jib cranes )
  • The tower crane
  • Mobile Crane , Gırgır Crane, Truck Mounted Cranes
  • Freight And Passenger Elevator , facade elevator
  • Periodically check chain hoist
  • Lift ( Tools , Workshop Type and Lifting )
  • forklift
  • Pallet
  • Platform
  • Marching Band and Ladders
  • Rope, slings , eyebolts, Trife is
  • Teleski chairlift
  • Several Belt Conveyor and Escalations
  • Puller Group ( chain and wire rope )
  • Cable Car System

Table 2- Minimum Control Period and Criteria of Hoisting and Conveying Equipment

NAME OF EQUIPMENT CONTROL PERIOD ( Maximum Time ) PERIODIC CONTROL MEASURES ( relevant standards are listed below. ) **
Removal and / or transmission means (1) , (2) , (3) Period specified in the standard 1 year TS 10116, TS EN 280 + A2, TS EN 818-6 + A1, TS EN 1495 + A2, TS EN 1709, TS EN 12079-3, TS EN 12927-7, TS EN 13157+A1, TS EN ISO 13534, TS ISO 789-2, TS ISO 3056, TS ISO 4309, TS ISO 7592, TS ISO 9927-1, TS ISO 11662-1, TS ISO 12480-1, TS ISO 12482 – 1, FEM 9.751, FEM 9.752, FEM 9.755 AND FEM 9.756 standard made ​​in accordance with the specified criteria .
Elevator ( human and Load Bearing ) (4) Period specified in the standard 1 year No. 26420 dated 01/31/2007 and the Lift Directive Official Gazette dated 18/11/2008 and numbered 27058 published in the Official Gazette Elevator Maintenance and Operation Regulations Without prejudice to the issues raised in the TS EN 81–3, TS EN 13015, TS ISO 9386-1 ve TS ISO 9386-2 standards It made according to the criteria .
Escalators and moving walkways Period specified in the standard 1 year TS EN 13015 is done under the conditions specified in the standard .
Stacking Machine ( forklifts , pallet trucks , lift) Period specified in the standard 1 year TS 10689, TS EN 1757-2, TS ISO 5057, TS 10201 ISO 3184, TS ISO 6055, TS ISO 1074 AND FEM 4.004 standard made ​​in accordance with the specified criteria .

 

( 1) test the static load test in which the cranes to do periodic checks , declared load is at least 1.25 , while the dynamic test must be at least 1.1 times

(2) The stability test equipment for mobile lifting out of the rest of lifting equipment must be made ​​in accordance with the criteria set out in the relevant standards in the lead.

(3 ) shall be used under the lifting capacity of the vehicle is to be removed is marked to appear full load. removal of lifting the weight above the declared load in cases where the said vehicle based on the amount of load to be removed without being subjected to the tests used in the framework of the above-mentioned criteria . ( Rated load; removal tool to remove the maximum weight declared by the employer . )

(4) Electronic control system in the industry to make periodic checks on the periodic control of the mechanical and electrical transmission equipment is equipped with a lift and served with authorized persons .

(**) It is given as an example in the table as a reference for the periodic inspection standards specified by the relevant standards issued after the date of publication of unspecified or regulation should be considered.

 

Table 2- Minimum Control Period and Criteria of Hoisting and Conveying Equipment

NAME OF EQUIPMENT CONTROL PERIOD ( Maximum Time ) PERIODIC CONTROL MEASURES ( relevant standards are listed below. ) **
Removal and / or transmission means (1) , (2) , (3) if the period specified in the standard 1 year TS 10116, TS EN 280 + A2, TS EN 818-6 + A1, TS EN 1495 + A2, TS EN 1709, TS EN 12079-3, TS EN 12927-7, TS EN 13157+A1, TS EN ISO 13534, TS ISO 789-2, TS ISO 3056, TS ISO 4309, TS ISO 7592, TS ISO 9927-1, TS ISO 11662-1, TS ISO 12480-1, TS ISO 12482 – 1, FEM 9.751, FEM 9.752, FEM 9.755 and FEM 9756 standards is done in accordance with the criteria.
Elevator ( human and Load Bearing ) (4) if the period specified in the standard 1 year No. 26420 dated 01/31/2007 and the Lift Directive Official Gazette dated 18/11/2008 and numbered 27058 published in the Official Gazette Elevator Maintenance and TS prejudice basis set by the Regulation EN 81-3 , EN 13015 , ISO 9386-1 and ISO 9386-2 , made ​​according to the criteria specified in the standard .
Escalators and moving walkways if the period specified in the standard 1 year TS EN 13015 is done under the conditions specified in the standard .
Stacking Machine ( forklifts , pallet trucks , lift) if the period specified in the standard 1 year TS 10689, TS EN 1757-2, TS ISO 5057, TS 10201 ISO 3184, TS ISO 6055, TS ISO 1074 and FEM 4004 On the specified criteria are made in accordance with the standards .

 

( 1) test the static load test in which the cranes to do periodic checks , declared load is at least 1.25 , while the dynamic test must be at least 1.1 times

(2) The stability test equipment for mobile lifting out of the rest of lifting equipment must be made ​​in accordance with the criteria set out in the relevant standards in the lead.

(3 ) shall be used under the lifting capacity of the vehicle is to be removed is marked to appear full load. removal of lifting the weight above the declared load in cases where the said vehicle based on the amount of load to be removed without being subjected to the tests used in the framework of the above-mentioned criteria . ( Rated load; removal tool to remove the maximum weight declared by the employer . )

(4) Electronic control system in the industry to make periodic checks on the periodic control of the mechanical and electrical transmission equipment is equipped with a lift and served with authorized persons .

 

(**) It is given as an example in the table as a reference for the periodic inspection standards specified by the relevant standards issued after the date of publication of unspecified or regulation should be considered.